
Fast DC Charger Gen 3
Our most powerful charger, for highway stops and fleet depots. Each port takes CCS2 or CHAdeMO, on a 5 m retractable cable. At 80 kW, a dual-port charger can charge two cars at once with split power. Choose the power, the ports and the connector on each.
- DC output
- 80 kW
- Output voltage
- 150–1000 V
- Retractable cables
- 5 m
- Efficiency
- 93%+
Your Fast DC Gen 3
80 kW, dual port, CCS2 + CHAdeMO, both at once
Every site is different, so we price the charger and its installation together after a free site survey.
Get to know the Fast DC Gen 3
Scroll to look at each part up close, or pick one from the list.

Scroll to look at each part up close.

How drivers charge
- 1
Park and plug in
Drivers take the connector that matches their car. The cable reaches 5 m.
- 2
Tap to start
An RFID card on the reader or the chargeNET app starts the charge.
- 3
Back on the road
The display shows progress, and the cable retracts out of the way when it’s put back.
Choosing your power
Cars charge at whichever is lower: the charger’s power or the most the car accepts on DC. At 80 kW, a dual-port charger can charge two cars at once with split power; at 40 kW, it charges one car at a time.
40 kW
- Range added in 30 minutes
- About 120 km
- Two ports
- One car at a time
- Good for
- Dealerships, hotels and workplaces
80 kW
Selected- Range added in 30 minutes
- About 240 km
- Two ports
- Both at once, or one at a time
- Good for
- Highway stops, fuel stations and fleet depots
Range figures are estimates at about 6 km per kWh at full power. Cars may use more or less.

Which connectors do you need?
Each port can have its own connector, so you can match the cars that use your site:
- CCS2
- The standard on most new electric cars. Most sites choose it for port 1.
- CHAdeMO
- Used by some Japanese models, such as the Nissan Leaf. Worth adding where these cars are common.
Installation
Every site is different, so we start by checking yours. Here’s how it works.
- 1
Site survey
We check your supply and main board, who will charge and for how long, and agree where each charger goes.
- 2
Design
We size the cabling and protection, and plan any supply upgrade your site needs before work starts.
- 3
Installation and commissioning
Our certified team installs and tests each charger, then connects it to the chargeNET network.
- 4
Handover and support
We set up access and pricing, show your team how it all works, and monitor the chargers remotely from then on.
Commercial installation includes
- Surge protection against voltage spikes and lightning
- Commercial RCBO protection on each charger circuit
- Armoured cabling and mounting, including a concrete base for floor-standing chargers
- Configuration, testing and connection to the chargeNET network
Specifications
Change an option to see how the specs change.
Your configuration
80 kW, dual port, CCS2 + CHAdeMO, both at once
Features
- CCS2 or CHAdeMO on each port
- Two cars at once, with split power
- Retractable cable management keeps the 5 m cables off the ground
- Backlit logo
- Start with the chargeNET app or an RFID card
- Class 0.5 S energy metering
- OCPP 1.6J over Wi-Fi or GSM / 4G / LTE
Input
- Connection
- 3-phase + N + PE
- Voltage
- 400 V AC, ±10%
- Frequency
- 50/60 Hz
- Current
- 120 A
- Power factor
- Over 0.95
- Protection
- Over-current, residual current (30 mA), over-voltage, over-temperature
- Over-voltage category
- Type III
- Standby power
- 10 W (super standby)
- Pollution degree
- 2
Output
- Power
- 80 kW
- Voltage
- 150–1000 V DC
- Current
- Up to 250 A
- Efficiency
- Over 93% at nominal output
- Ports
- 2, charging at the same time
- Protection
- DC leakage protection, emergency stop, over-current
Connectors and cable
- Port 1
- CCS2
- Port 2
- CHAdeMO
- Standards available
- CCS Type 2, CHAdeMO
- Cable length
- 5 m
- Cable management
- Retractable
Display and access
- Display
- 10.1-inch high-brightness colour display
- Starting a charge
- chargeNET app or RFID card
- Energy metering
- Class 0.5 S (IEC 62052-22 / IEC 62053-24)
- Backlit logo
- Yes
Connectivity
- Back-office protocol
- OCPP 1.6J Core
- Network
- Wi-Fi 2.4 GHz, GSM / 4G / LTE
Build
- Dimensions
- 2160 × 950 × 410 mm
- Operating temperature
- −10 °C to 55 °C
- Humidity
- 20% to 95% RH, non-condensing
Service
- Installation
- Quoted after a free site survey
Talk to us about the Fast DC Gen 3
You’ve chosen 80 kW, dual port, CCS2 + CHAdeMO, both at once. Tell us about your site, how many chargers you need and the vehicles that will use them, and we’ll arrange a survey and send you a quote.


